An Efficient Flow Shop Scheduling Problem With Makespan Objective
نویسندگان
چکیده
منابع مشابه
An Efficient Iterated Greedy Algorithm for the Makespan Blocking Flow Shop Scheduling Problem
We propose in this paper a Blocking Iterated Greedy algorithm (BIG) which makes an adjustment between two relevant destruction and construction stages to solve the blocking flow shop scheduling problem and minimize the maximum completion time (makespan). The greedy algorithm starts from an initial solution generated based on some well-known heuristic. Then, solutions are enhanced till some stop...
متن کاملAn algorithm for multi-objective job shop scheduling problem
Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...
متن کاملA multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation
Scheduling for a two-stage production system is one of the most common problems in production management. In this production system, a number of products are produced and each product is assembled from a set of parts. The parts are produced in the first stage that is a fabrication stage and then they are assembled in the second stage that usually is an assembly stage. In this article, the first...
متن کاملMulti-objective Differential Evolution for the Flow shop Scheduling Problem with a Modified Learning Effect
This paper proposes an effective multi-objective differential evolution algorithm (MDES) to solve a permutation flow shop scheduling problem (PFSSP) with modified Dejong's learning effect. The proposed algorithm combines the basic differential evolution (DE) with local search and borrows the selection operator from NSGA-II to improve the general performance. First the problem is encoded with a...
متن کاملFlow shop Scheduling Problem with Maintenance Coordination: a New Approach
This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Turkish Journal of Computer and Mathematics Education (TURCOMAT)
سال: 2021
ISSN: 1309-4653
DOI: 10.17762/turcomat.v12i4.527