Generation expansion planning (GEP) models have been useful aids for long-term planning. Recent growth in intermittent renewable generation has increased the need to represent capability non-renewables respond rapid changes daily loads, leading research bring unit commitment (UC) features into GEPs. Such GEP+UC usually contain discrete variables which, along with many details, make computation times impractically long analysts who develop, debug, modify and use GEP alternative runs. We propose a aggregated by technology type, minimal UC content necessary limitations on demand, i.e., ramp-up ramp-down constraints, ramp limits estimated from historical data maximum rates of change each type. illustrate province Ontario Canada; is large scale linear program that solves less than one hour modest computing equipment, credible solutions.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Fuzzy Multi Objective Programming Model for Power Generation and Transmission Expansion Planning Problem

The increasing consumption of electricity over time forces different countries to establishnew power plants and transmission lines. There are various crisp single-objective mathematicalmodels in the literature for the long-term power generation and transmission expansion planning tohelp the decision makers to make more reasonable decisions. But, in practice, most of the parametersassociated wit...

متن کامل

A Mathematical Model for Multi-Region, Multi-Source, Multi-Period Generation Expansion Planning in Renewable Energy for Country-Wide Generation-Transmission Planning

Environmental pollution and rapid depletion are among the chief concerns about fossil fuels such as oil, gas, and coal. Renewable energy sources do not suffer from such limitations and are considered the best choice to replace fossil fuels. The present study develops a mathematical model for optimal allocation of regional renewable energy to meet a country-wide demand and its other essential as...

متن کامل

Incorporating short-term operational plant constraints into assessments of future electricity generation portfolios

This paper presents a post-processing extension to a Monte-Carlo based generation planning tool in order to assess the short-term operational implications of different possible future generation portfolios. This extension involves running promising portfolios through a year of economic dispatch at 30 minute intervals whilst considering operational constraints and associated costs including mini...

متن کامل

A Stochastic Operational Planning Model for Smart Power Systems

Smart Grids are result of utilizing novel technologies such as distributed energy resources, and communication technologies in power system to compensate some of its defects. Various power resources provide some benefits for operation domain however, power system operator should use a powerful methodology to manage them. Renewable resources and load add uncertainty to the problem. So, independe...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Social Science Research Network

سال: 2022

ISSN: ['1556-5068']

DOI: https://doi.org/10.2139/ssrn.4218422