An efficient constructive heuristic to balance trade-offs between makespan and flowtime in permutation flow shop scheduling

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Two-Phase Constructive Heuristic for Permutation Flow-Shop Scheduling Problem Minimizing Total Completion Time

This paper describes a polynomial-time heuristic for the permutation flow-shop scheduling problem with the criterion of minimizing total completion time. The proposed method consists of two phases: arranging the jobs in priority order and then constructing a sequence. A new ranking method is employed to prioritize the jobs for incorporating into the construction phase of the heuristic. Computat...

متن کامل

Evolutionary Clustering Search for Flowtime Minimization in Permutation Flow Shop

This paper deals with the Permutation Flow Shop scheduling problem with the objective of minimizing total flow time, and therefore reducing in-process inventory. A new hybrid metaheuristic Genetic Algorithm Cluster Search is proposed for the scheduling problem solution. The performance of the proposed method is evaluated and results are compared with the best reported in the literature. Experim...

متن کامل

A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems

Article history: Received 23 January 2010 Received in revised form 23 April 2010 Accepted 26 April 2010 Available online 26 April 2010 During the past two decades, there have been increasing interests on permutation flow shop with different types of objective functions such as minimizing the makespan, the weighted mean flow-time etc. The permutation flow shop is formulated as a mixed integer pr...

متن کامل

A hybrid algorithm to minimize makespan for the permutation flow shop scheduling problem

This paper deals with the permutation flow shop scheduling problem. The objective is to minimize the maximum completion time, or makespan. To solve this problem which has been proved to be strongly NP-hard, a combination between an ant colony algorithm, a heuristic algorithm and a local search procedure is proposed and presented. The hybrid approach is to use artificial ants to construct soluti...

متن کامل

A review and classification of heuristics for permutation flow-shop scheduling with makespan objective

Makespan minimisation in permutation flow shop scheduling is an OR topic that has been intensively addressed in the last 40 years. Since the problem is known to be NPcomplete for more than two machines, most of the research effort has been devoted to the development of heuristic procedures in order to provide good approximate solutions to the problem. However, little attention has been devoted ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Procedia Manufacturing

سال: 2018

ISSN: 2351-9789

DOI: 10.1016/j.promfg.2018.07.005