An effective iterated greedy algorithm for blocking hybrid flow shop problem with due date window
نویسندگان
چکیده
Nowadays many industry consider an interval time as a due date instead of precise points in time. In this study, the hybrid flow shop scheduling problem with basic blocking constraint is tackled. Where jobs, if done within window, are deemed on Therefore, criterion to minimize sum weighted earliness and tardiness. This variant flowshop not investigated best our knowledge. we introduced new metaheuristic centered iterated greedy approach. evaluate proposed method start by re-implementation comparison seven well-selected procedures that treat problem. order prove robustness method, evaluated it using benchmark more than 1000 instances. The experimental results demonstrated algorithm effective produces very high solution.
منابع مشابه
An Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria
In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is t...
متن کاملan iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time criteria
in this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. the steps of this algorithm are designed very efficient. for generating an initial solution, we develop an efficient constructive heuristic by modifying the best known neh algorithm. effectiveness of the proposed iterated greedy algorithm is t...
متن کاملAn Efficient Iterated Greedy Algorithm for the Makespan Blocking Flow Shop Scheduling Problem
We propose in this paper a Blocking Iterated Greedy algorithm (BIG) which makes an adjustment between two relevant destruction and construction stages to solve the blocking flow shop scheduling problem and minimize the maximum completion time (makespan). The greedy algorithm starts from an initial solution generated based on some well-known heuristic. Then, solutions are enhanced till some stop...
متن کاملAn Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria
In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is t...
متن کاملAn efficient hybrid iterated local search algorithm for the total tardiness blocking flow shop problem
This paper deals with the blocking flow shop problem and proposes an Iterated Local Search (ILS) procedure combined with a variable neighbourhood search (VNS) for the total tardiness minimization. The proposed ILS makes use of a NEH-based procedure to generate the initial solution, uses a local search to intensify the exploration which combines the insertion and swap neighbourhood and uses a pe...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Rairo-operations Research
سال: 2021
ISSN: ['1290-3868', '0399-0559']
DOI: https://doi.org/10.1051/ro/2021076