An economic model for selecting Douglas-fir reforestation projects

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Douglas-fir beetle

1Principal Entomologist and Project Leader (retired), Forestry Sciences Laboratory, USDA Forest Service, Moscow, ID; 2Forest Entomologist, USDA Forest Service, Forest Health Protection, Northern Region, Coeur d’Alene, ID. Douglas-fir beetle galleries are distinctive, having eggs laid individually in niches alternating on opposite sides of the gallery. The Douglas-fir beetle (Dendroctonus pseudo...

متن کامل

designing a model for selecting construction projects in public sector

much research hasn’t been done in the area of project selection in the public sector. in this paper, we tried to choose projects in the public sector, and a linear programming model is presented. in an effort to build the model, the decision criteria were identified using the delphi method and then the criteria were reviewed at conceptual combining. the model was constructed in a linear, goal a...

متن کامل

designing a decision making model for selecting technology transfer projects

in this paper, first, a conceptual framework has been developed and while truly recognizing different aspects of the technology transfer process, it is trying to introduce a decision-making methodology in the choice of projects. then by choosing effective variables in technology transfer process, a multiple criteria decision-making (mcdm) model has been designed, so that the choice of appropria...

متن کامل

model to selecting contractors in software projects

organizations in private and public sector assign many projects in information technology (particularly software) field to contractors for implementation every year. previous experiences shows that most of these projects are stopped before finishing or cannot meet the expected results. based on studies related to this issue, many of failures depend on implementation contractor, directly or indi...

متن کامل

A MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS

Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Hilgardia

سال: 1973

ISSN: 0073-2230

DOI: 10.3733/hilg.v42n03p035