An Earned-Value Approach to Assess and Monitor Software Project Uncertainty: A Case Study in Software Test Execution

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Value-based Software Engineering: a Case Study Using Earned Value

plex project. But it has absolutely nothing to say about the stakeholder value of the system the project is developing. It serves a purpose, but needs to be incorporated into feedback control systems that focus on the real stakeholder value being earned. The value-based software engineering agenda, described in the “Accounting for Value in Software Engineering” sidebar, seeks to integrate value...

متن کامل

a frame semantic approach to the study of translating cultural scripts in salingers franny and zooey

the frame semantic theory is a nascent approach in the area of translation studies which goes beyond the linguistic barriers and helps us to incorporate cognitive and cultural factors to the study of translation. based on rojos analytical model (2002b), which centered in the frames or knowledge structures activated in the text, the present research explores the various translation problems that...

15 صفحه اول

the aesthetic dimension of howard barkers art: a frankfurtian approach to scenes from an execution and no end of blame

رابطه ی میانِ هنر و شرایطِ اجتماعیِ زایش آن همواره در طولِ تاریخ دغدغه ی ذهنی و دل مشغولیِ اساسیِ منتقدان و نیز هنرمندان بوده است. از آنجا که هنر در قفس آهنیِ زندگیِ اجتماعی محبوس است، گسترش وابستگیِ آن با نهاد ها و اصولِ اجتماعی پیرامون، صرفِ نظر از هم سو بودن و یا غیرِ هم سو بودنِ آن نهاد ها، امری اجتناب ناپذیر به نظر می رسد. با این وجود پدیدار گشتنِ چنین مباحثِ حائز اهمییتی در میان منتقدین، با ظهورِ مکتب ما...

Value of Project Management –a Value Assessment Based Case Study for Software Project

The amount of software has increased in several products. Software projects have become more complex and their management requires significant amount of skills from every project manager. The amount of available resources, strict budgets, cost control and need for accurate reporting and documentation as well as good quality are part of every project managers’ life. As business challenges projec...

متن کامل

a modern approach in producing customized software packages (case study)

increasing competitiveness between software companies , that stems from customer needs and new information technologies, obliges the companies to improve their products’ quality according to high speed and low cost. this research seeks to introduce and determine the software production assembly line, one of the software development approaches. a three stage questionnaire was used to collect inf...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Information Technology Journal

سال: 2010

ISSN: 1812-5638

DOI: 10.3923/itj.2010.1104.1114