An Earned Schedule-based regression model to improve cost estimate at completion

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

applying forecasting models through estimate at completion cost of project in using earned value analysis

earned value management (evm) is the process of integrating the time and cost management within the framework of project scope management. the earned value has provided methods for predicting the cost for projects. in large part, these methods have not been improved upon since their beginnings and remain unsubstantiated as to accuracy. in this direction, several mathematics formulas have been d...

متن کامل

An Extension of the Earned Value Management to Improve the Accuracy of Schedule Analysis Results

A project is any endeavor involving planned action, for example, developing a new product or constructing a dam. [CE1] Major factors for a project to be successful are applying performance measurement and feedback tool. One such well-known performance measurement tool to control the project execution is earned value management (EVM). EVM uses the fundamental principle that trends in the past ca...

متن کامل

an extension of the earned value management to improve the accuracy of schedule analysis results

a project is any endeavor involving planned action, for example, developing a new product or constructing a dam. [ce1] major factors for a project to be successful are applying performance measurement and feedback tool. one such well-known performance measurement tool to control the project execution is earned value management (evm). evm uses the fundamental principle that trends in the past ca...

متن کامل

Forecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method

Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...

متن کامل

An Improved COCOMO based Model to Estimate the Effort of Software Projects

One of important aspects of software projects is estimating the cost and time required to develop projects. Nowadays, this issue has become one of the key concerns of project managers. Accurate estimation of essential effort to produce and develop software is heavily effective on success or failure of software projects and it is highly regarded as a vital factor. Failure to achieve convincing a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Project Management

سال: 2014

ISSN: 0263-7863

DOI: 10.1016/j.ijproman.2013.12.005