An approximation algorithm based on game theory for scheduling simple linear deteriorating jobs

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An approximation algorithm based on game theory for scheduling simple linear deteriorating jobs

Article history: Received 5 August 2013 Received in revised form 2 May 2014 Accepted 28 May 2014 Communicated by D.-Z. Du

متن کامل

Online Makespan Scheduling of Linear Deteriorating Jobs on Parallel Machines

Traditional scheduling assumes that the processing time of a job is fixed. Yet there are numerous situations that the processing time increases (deteriorates) as the start time increases. Examples include scheduling cleaning or maintenance, fire fighting, steel production and financial management. Scheduling of deteriorating jobs was first introduced on a single machine by Browne and Yechiali, ...

متن کامل

Scheduling Resumable Deteriorating Jobs

We consider the following single-machine time-dependent scheduling problem with constraints on the machine availability. There is given a set of independent and deteriorating jobs Jj , 1 ≤ j ≤ n, to be processed on a single machine, starting from time t0 > 0. The processing time pj of job Jj is a proportional function of the starting time Sj of this job, pj = αjSj, where Sj ≥ t0 and deteriorati...

متن کامل

Scheduling Deteriorating Jobs on a Single Processor

Your use of the JSTOR archive indicates your acceptance of JSTOR's Terms and Conditions of Use, available at http://www.jstor.org/page/info/about/policies/terms.jsp. JSTOR's Terms and Conditions of Use provides, in part, that unless you have obtained prior permission, you may not download an entire issue of a journal or multiple copies of articles, and you may use content in the JSTOR archive o...

متن کامل

Scheduling Linearly Deteriorating Jobs on Multiple Machines

This paper investigates the scheduling problems in which the job processing times do not remain constant but are increasing linear functions of their starting times. Two deteriorating scheduling models, Model 1 and Model 2, for multiple machines are considered, with the goal being to minimize the makespan. In this paper, we propose an efficient heuristic for Model 1 and prove that the ratio of ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Theoretical Computer Science

سال: 2014

ISSN: 0304-3975

DOI: 10.1016/j.tcs.2014.05.023