An analysis of certification processes for Good Clinical Practice and project management competencies
نویسندگان
چکیده
Aim/purpose – The purpose of this paper is to clarify the certification process Good Clinical Practice (GCP) competencies based on a comparison with project management (PM) process. This aim was accomplished by model development. Design/methodology/approach study divided into three main phases: 1st phase identification key characteristics PM and GCP processes, 2nd development models for GCP, 3rd conclusions from in-depth interviews. Findings As result research, processes were identified, developed. In addition, interviews, solutions organizing way confirming knowledge guidelines proposed. Research implications/limitations proposed rules may be too complex exceed needs expectations clinical trial environment. focus stakeholder relations, without granting procedures, enable broader contextualization issues discussed in paper. analysis might fragmented as it regards sole research refers Poland only, hence will valuable identify whether foreign authorities have same attitude competency model. It recommended increase number respondents’ interviews obtain results higher validity reliability. Originality/value/contribution raises topics at crossroads management, trials, that been underdeveloped so far. significant all organizations involved conducting projects. findings contribute quality trials provide public assurance rights, safety, well-being subjects are protected data credible. Keywords: certification, Practice, GCP. JEL Classification: M10, O32, I11.
منابع مشابه
langauge needs analysis of undergraduate business management and economics students
the aim of conducting this study was to investigate the foreign language learning needs of undergraduate economics students and business management students in faculties of social sciences of alzahra and azad naragh university. in the study, which was designed on the basis of a qualitative-quantitative basis using interviews and questionnaires, 146 female undergraduate business management as we...
15 صفحه اولProject Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)
Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...
متن کاملdevelopment and implementation of an optimized control strategy for induction machine in an electric vehicle
in the area of automotive engineering there is a tendency to more electrification of power train. in this work control of an induction machine for the application of electric vehicle is investigated. through the changing operating point of the machine, adapting the rotor magnetization current seems to be useful to increase the machines efficiency. in the literature there are many approaches wh...
15 صفحه اولan investigation of the impact of self monitoring on langauge teachers motivational practice and its effect on learners motivation
the central purpose of this study was to conduct a case study about the role of self monitoring in teacher’s use of motivational strategies. furthermore it focused on how these strategies affected students’ motivational behavior. although many studies have been done to investigate teachers’ motivational strategies use (cheng & d?rnyei, 2007; d?rnyei & csizer, 1998; green, 2001, guilloteaux & d?...
ذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Economics & Management
سال: 2021
ISSN: ['2719-9975', '1732-1948']
DOI: https://doi.org/10.22367/jem.2021.43.09