AN ALGORITHM FOR A PARTIALLY CHANCE-CONSTRAINED E-MODEL

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

RAO*: An Algorithm for Chance-Constrained POMDP's

Autonomous agents operating in partially observable stochastic environments often face the problem of optimizing expected performance while bounding the risk of violating safety constraints. Such problems can be modeled as chance-constrained POMDP’s (CCPOMDP’s). Our first contribution is a systematic derivation of execution risk in POMDP domains, which improves upon how chance constraints are h...

متن کامل

A Chance Constrained Model for a Two Units Series Critical System Suffering From Continuous Deterioration

In this paper we focus on a continuously deteriorating two units series equipment which its failure can not be measured by cost criterion. For these types of systems avoiding failure during the actual operation of the system is extremely important. In this paper we determine inspection periods and maintenance policy in such a way that failure probability is limited to a pre-specified value and ...

متن کامل

SOME PROPERTIES FOR FUZZY CHANCE CONSTRAINED PROGRAMMING

Convexity theory and duality theory are important issues in math- ematical programming. Within the framework of credibility theory, this paper rst introduces the concept of convex fuzzy variables and some basic criteria. Furthermore, a convexity theorem for fuzzy chance constrained programming is proved by adding some convexity conditions on the objective and constraint functions. Finally,...

متن کامل

A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

متن کامل

An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm

In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Operations Research Society of Japan

سال: 1979

ISSN: 0453-4514,2188-8299

DOI: 10.15807/jorsj.22.233