AN ALGORITHM FOR A PARTIALLY CHANCE-CONSTRAINED E-MODEL
نویسندگان
چکیده
منابع مشابه
RAO*: An Algorithm for Chance-Constrained POMDP's
Autonomous agents operating in partially observable stochastic environments often face the problem of optimizing expected performance while bounding the risk of violating safety constraints. Such problems can be modeled as chance-constrained POMDP’s (CCPOMDP’s). Our first contribution is a systematic derivation of execution risk in POMDP domains, which improves upon how chance constraints are h...
متن کاملA Chance Constrained Model for a Two Units Series Critical System Suffering From Continuous Deterioration
In this paper we focus on a continuously deteriorating two units series equipment which its failure can not be measured by cost criterion. For these types of systems avoiding failure during the actual operation of the system is extremely important. In this paper we determine inspection periods and maintenance policy in such a way that failure probability is limited to a pre-specified value and ...
متن کاملSOME PROPERTIES FOR FUZZY CHANCE CONSTRAINED PROGRAMMING
Convexity theory and duality theory are important issues in math- ematical programming. Within the framework of credibility theory, this paper rst introduces the concept of convex fuzzy variables and some basic criteria. Furthermore, a convexity theorem for fuzzy chance constrained programming is proved by adding some convexity conditions on the objective and constraint functions. Finally,...
متن کاملA Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
متن کاملAn Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm
In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Operations Research Society of Japan
سال: 1979
ISSN: 0453-4514,2188-8299
DOI: 10.15807/jorsj.22.233