Alternative subgraphs assembly line balancing problem with resource selection and parallel stations
نویسندگان
چکیده
This article presents a novel alternative subgraphs assembly line balancing problem with resource selection and parallel stations. The model considers both the choice between different process alternatives of production resources for various tasks. It also allows parallelization stations in balanced line, thereby improving flexibility algorithm. objective optimization is to minimize total cost planned line. A genetic algorithm used solving model. To evaluate its functionality, approach was applied 486 well-known reference problems. In addition, problems were expanded create new set that serve as benchmark algorithm’s capabilities. results show presented feasible formulated problem.
منابع مشابه
Optimally solving the alternative subgraphs assembly line balancing problem
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing any unit of the products to be assembled among the work stations along a manufacturing line as used in the automotive or the electronics industries. Usually, it is assumed that the production process is fixed, i.e., has been determined in a preceding planning step. However, this sequential plann...
متن کاملTwo extensions for the assembly line worker assignment and balancing problem: parallel stations and collaborative approach
In this article, we introduce two new variants of the assembly line worker assignment and balancing problem that allow parallelization of and collaboration between heterogeneous workers. These new line balancing approaches introduce an additional level of flexibility in the assignment and planning process, which may be particularly useful in practical situations where the aim is to progressivel...
متن کاملA Hybrid Unconscious Search Algorithm for Mixed-model Assembly Line Balancing Problem with SDST, Parallel Workstation and Learning Effect
Due to the variety of products, simultaneous production of different models has an important role in production systems. Moreover, considering the realistic constraints in designing production lines attracted a lot of attentions in recent researches. Since the assembly line balancing problem is NP-hard, efficient methods are needed to solve this kind of problems. In this study, a new hybrid met...
متن کاملcost-oriented assembly line balancing with resource constraint
in this paper, based on the background of cost-oriented assembly line balancing problems, a novel mathematical model for scheduling and balancing the assembly line is offered that with the combination of task sequence-dependent setup time, parallel stations and resource constraint, minimizes the operational and investment costs of assembly system. due to the complexity of the problem, the equat...
متن کاملgenetic algorithms for assembly line balancing problem
there are some machineries and equipments as well as relatively fix amount of human resources involved in any production process. in many cases, by observing operational method of a process, one may see that some of these machineries are not working, but on the other hand, other equipments are continuously working, and many parts are set in front of them, waiting to be set up over machines to c...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Engineering Optimization
سال: 2021
ISSN: ['1029-0273', '0305-215X', '1026-745X']
DOI: https://doi.org/10.1080/0305215x.2021.1964493