Alternatif Perkuatan Timbunan Existing Railway Track Sta 141+100 - 141+600 "Bojonegoro - Surabaya Pasar Turi"

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Square Joints in Railway Track Waves

When rails are laid in a railway track, small gaps are left between the ends of adjoining rails to allow for the expansion of the rails when the temperature rises. Rail joints are provided to form a continuous rail path which are normally laid in standard lengths bolted together by fishplates. When two rail joints are exactly opposing each other, they are called square (side by side) joints...

متن کامل

Square Joints in Railway Track Waves

When rails are laid in a railway track, small gaps are left between the ends of adjoining rails to allow for the expansion of the rails when the temperature rises. Rail joints are provided to form a continuous rail path which are normally laid in standard lengths bolted together by fishplates. When two rail joints are exactly opposing each other, they are called square &#10&#10(side by side) jo...

متن کامل

Railway Track Allocation

This article gives an overview of the results of the author’s PhD thesis Schlechte [2012]. The thesis deals with the mathematical optimization for the efficient use of railway infrastructure. We address the optimal allocation of the available railway track capacity the track allocation problem. This track allocation problem is a major challenge for a railway company, independent of whether a fr...

متن کامل

Railway track inspection using GPR

Ž . Swiss Federal Railways SBB inspect their railway tracks at regular intervals. The first step of track renewal planning is a geotechnical study. Inspection is focused on the thickness of the ballast, on subsoil material penetrating upwards into the ballast and on geotechnical properties of subgrade and subsoil materials. Up to now, the inspection has been done mainly by digging trenches at e...

متن کامل

Solving Railway Track Allocation Problems

The optimal track allocation problem (OPTRA), also known as the train routing problem or the train timetabling problem, is to find, in a given railway network, a conflict-free set of train routes of maximum value. We propose a novel integer programming formulation for this problem that is based on additional ‘configuration’ variables. Its LP-relaxation can be solved in polynomial time. These re...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Jurnal Teknik ITS

سال: 2017

ISSN: 2337-3539,2301-9271

DOI: 10.12962/j23373539.v6i2.25873