Allocation of Costs and Risks among Stakeholders for Adapting Existing Dams to Flood Risk Management

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The use of flood risk map for flood management (urban area of Nekarood)

Flood is considered as a major threat among natural disasters in the world. This case becomes more important and has a higher risk in urban areas due to the existence of important uses. Therefore, to reduce damages resulted from flood, this phenomenon must be managed and planned using structural and non-structural approaches. Considering the development in Iran has been carried out in high risk...

متن کامل

a benchmarking approach to optimal asset allocation for insurers and pension funds

uncertainty in the financial market will be driven by underlying brownian motions, while the assets are assumed to be general stochastic processes adapted to the filtration of the brownian motions. the goal of this study is to calculate the accumulated wealth in order to optimize the expected terminal value using a suitable utility function. this thesis introduced the lim-wong’s benchmark fun...

15 صفحه اول

Collaborative modelling for active involvement of stakeholders in urban flood risk management

This paper presents an approach to enhance the role of local stakeholders in dealing with urban floods. The concept is based on the DIANE-CM project (Decentralised Integrated Analysis and Enhancement of Awareness through Collaborative Modelling and Management of Flood Risk) of the 2nd ERANET CRUE funding initiative. The main objective of the project was to develop and test an advanced methodolo...

متن کامل

A Model for Sharing the Costs of Uncontrollable Risks among Contracting Parties

The allocation of risks among the contracting parties in a contract is an important decision affecting the project success. Some risks in a project are uncontrollable; these are imposed to a project by external factors. Since contracting parties can neither control nor affect the occurrence of such risks, their allocation to a party would be inequitable. Therefore the cost overrun related to un...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: JOURNAL OF JAPAN SOCIETY OF HYDROLOGY AND WATER RESOURCES

سال: 2010

ISSN: 1349-2853,0915-1389

DOI: 10.3178/jjshwr.23.444