Algorithm 49. An algorithm for solving the machine sequencing problem
نویسندگان
چکیده
منابع مشابه
the algorithm for solving the inverse numerical range problem
برد عددی ماتریس مربعی a را با w(a) نشان داده و به این صورت تعریف می کنیم w(a)={x8ax:x ?s1} ، که در آن s1 گوی واحد است. در سال 2009، راسل کاردن مساله برد عددی معکوس را به این صورت مطرح کرده است : برای نقطه z?w(a)، بردار x?s1 را به گونه ای می یابیم که z=x*ax، در این پایان نامه ، الگوریتمی برای حل مساله برد عددی معکوس ارانه می دهیم.
15 صفحه اولA Fuzzy Algorithm for the m-Machine, n-Job Flow Shop Sequencing Problem
Flow shop sequencing problem is included in NP-hard problems and a number of heuristic methods have been developed to solve it. Most of these methods are offered for the crisp processing time. However fuzzy algorithm is appropriate for the problems with fuzzy processing time. This paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...
متن کاملA Fuzzy Algorithm for the m-Machine, n-Job Flow Shop Sequencing Problem
Flow shop sequencing problem is included in NP-hard problems and a number of heuristic methods have been developed to solve it. Most of these methods are offered for the crisp processing time. However fuzzy algorithm is appropriate for the problems with fuzzy processing time. This paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...
متن کاملa fuzzy algorithm for the m-machine, n-job flow shop sequencing problem
flow shop sequencing problem is included in np-hard problems and a number of heuristic methods have been developed to solve it. most of these methods are offered for the crisp processing time. however fuzzy algorithm is appropriate for the problems with fuzzy processing time. this paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...
متن کاملAn imperialist competitive algorithm for solving the production scheduling problem in open pit mine
Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applicationes Mathematicae
سال: 1977
ISSN: 1233-7234,1730-6280
DOI: 10.4064/am-15-4-523-542