Aircraft Maintenance Planning Using Fuzzy Critical Path Analysis

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Path Planning of Mobile Robot Using Fuzzy - Potential Field Method

This paper deals with the navigation of a mobile robot in unknown environment using artificial potential field method. The aim of this paper is to develop a complete method that allows the mobile robot to reach its goal while avoiding unknown obstacles on its path. An approach proposed is introduced in this paper based on combing the artificial potential field method with fuzzy logic controller...

متن کامل

Critical path analysis in the network with fuzzy activity times

A natural generalization of the criticality notion in a network with fuzzy activity times is given. It consists in direct application of the extension principle of Zadeh to the notion of criticality of a path (an activity, an event) treated as a function of the activities duration times in the network. There are shown some relations between the notion of fuzzy criticality, introduced in the pap...

متن کامل

Centralized Path Planning for Multi-aircraft in the Presence of Static and Moving Obstacles

This article proposes a new approach for centralized path planning of multiple aircraft in presence of the obstacle-laden environment under low flying rules. The problem considers as a unified nonlinear constraint optimization problem. The minimum time and control investigate as the cost functions and the maximum velocity and power consider as the constraints. The pseudospectral method applies ...

متن کامل

A Critical Path Problem Using Intuitionistic Triangular Fuzzy Number

Critical path method is a network based method planned for development and organization of complex project in real world application. In this paper, a new methodology has been made to find the critical path in a directed acyclic graph, whose activity time uncertain. The vague parameters in the network are represented by intuitionistic triangular fuzzy numbers, instead of crisp numbers. A new pr...

متن کامل

Aircraft maintenance planning and scheduling: An integrated framework

Purpose – The purpose of this paper is to examine how certain limitations of the current approaches to planning and scheduling of aircraft heavy maintenance can be addressed using a single integrated framework supported by unified data structures. Design/methodology/approach – The “unitary structuring technique”, originally developed within the context of manufacturing planning and control, is ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Computational Intelligence Systems

سال: 2012

ISSN: 1875-6891,1875-6883

DOI: 10.1080/18756891.2012.696920