AHP_FCE-based high-rise building construction risk assessment
نویسندگان
چکیده
منابع مشابه
Predicting the High-rise building construction project safety risk based on QPSO-SVM model
In this paper, we aim to solve the problem of high-rise building construction project safety risk forecasting. The main innovation of this paper lies in that we convert the project safety risk forecasting problem to a classification problem, and design a novel QPSO-SVM model to implement the classification process. Before predicting the project safety risk, we present an index system, which con...
متن کاملScheduling for High-rise Building Construction Using Simulation Techniques
High-rise buildings are commonly built in densely populated countries or urban areas. A balanced floor construction cycle is critical for construction of the frame structures. The objectives in scheduling the floor cycle are to ensure smooth flows of resources and to optimise the use of formwork and other materials. The floor area is usually divided into zones to allow the labour force and form...
متن کاملA FLEXIBLE METHOD OF BUILDING CONSTRUCTION SAFETY RISK ASSESSMENT AND INVESTIGATING FINANCIAL ASPECTS OF SAFETY PROGRAM
Construction industry has the highest ratio of fatality of workers in comparison with other industries. Construction safety has been always a matter of focus to control safety risks. This article presents a new flexible method of safety risk assessment by adding Hybrid Value Number (HVN) to the assessment equation. As a result of using this method, the results of assessment process will be more...
متن کاملLandscape assessment of high-rise buildings: A method based on 3DGIS, BIM and AHP
In this paper, we propose a quantitative indicator for measuring and ranking real estate from the perspective of the surrounding landscape by integrating the building information model (BIM) and the three-dimensional geospatial information system (3DGIS) based on the AHP method. The landscape is one of the qualitative variables which it's measuring and quantifying is a complex task. In previous...
متن کاملSimulation model incorporating genetic algorithms for optimal temporary hoist planning in high-rise building construction
a r t i c l e i n f o Temporary hoist planning is a key factor for successful project completion in a high-rise building construction. Inadequate plans for hoists in the early stages of a project can cause problems such as failing to hoist resources as required or leaving hoists idle. There are two existing approaches, simple formulas and simulation techniques, for planning temporary hoists. Ho...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IOP Conference Series: Materials Science and Engineering
سال: 2020
ISSN: 1757-899X
DOI: 10.1088/1757-899x/780/7/072035