Advanced Power Network System-Autonomous Demand Area Power System

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Power System Reliability Analysis with Emergency Demand Response Program

With the development of restructured power systems and increase of prices in some hours of day and increase fuel price, demand response programs were noticed more by customers. demand response consists of a series of activities that governments or utilities design to change the amount or time of electric energy consumption, to achieve better social welfare or some times for maximizing the benef...

متن کامل

Power System Reliability Analysis with Emergency Demand Response Program

With the development of restructured power systems and increase of prices in some hours of day and increase fuel price, demand response programs were noticed more by customers. demand response consists of a series of activities that governments or utilities design to change the amount or time of electric energy consumption, to achieve better social welfare or some times for maximizing the benef...

متن کامل

network formulation for power system analysis

this paper presents as a brief introduction , the basic principles of matrix algebra for an alysing the power system problems with digital computers. the material contained in the text are as follows: primitive network, topology of electrical network, transformation of coordinates, bus admittance and bus impedance matrix.

متن کامل

power system reliability analysis with emergency demand response program

with the development of restructured power systems and increase of prices in some hours of day and increase fuel price, demand response programs were noticed more by customers. demand response consists of a series of activities that governments or utilities design to change the amount or time of electric energy consumption, to achieve better social welfare or some times for maximizing the benef...

متن کامل

Power Saving by Demand Monitoring System

Demand monitoring equipment is installed in each factory or office, and is linked to the Mitsubishi Electric Head Office via the intranet, where a centralized monitoring server provides comprehensive control (Fig. 1). The multi-demand viewer uses its wide-area control function to collect electric power data from each site in real time, and sends out an alert e-mail when there is a high probabil...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The Journal of The Institute of Electrical Engineers of Japan

سال: 2005

ISSN: 1340-5551,1881-4190

DOI: 10.1541/ieejjournal.125.156