Advanced Available-To-Promise for Order Management in Stock-out Situation

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Simulation-Optimization Model For Capacity Coordination In Make To Stock/Make To Order Production Environments

Capacity coordination, as the tactical level of hierarchical production planning in hybrid MTS/MTO systems, includes numerous important decisions. In this paper, two of these decisions i.e. finding the best strategy for the acceptance/rejection of incoming orders and determining orders’ due dates – are investigated. Also a simulation model is proposed to evaluate the efficiency of the presented...

متن کامل

Mixed Model Assembly Line Sequencing In Make to Order System with Available to Promise Consideration

Mixed model assembly lines (MMAL) are a type of production line where a variety of product models similar in product characteristics are assembled. The effective design of these lines requires that schedule for assembling the different products is determined. In this paper we tried to fit the sequencing problem with the main characteristics of make to order (MTO) environment. The problem solved...

متن کامل

Opportunities for active stock-out management in online stores: The impact of the stock-out policy on online stock-out reactions

a Faculty of Economics and Business Administration, Department of Marketing, Maastricht University, P.O. Box 616, 6200 MD Maastricht, The Netherlands b Faculty of Economics and Applied Economics, Department of Marketing, Catholic University Leuven, Naamsestraat 69, 3000 Leuven, Belgium c Faculty of Economics and Business Administration, Department of Marketing, University of Tilburg, P.O. Box 9...

متن کامل

Prioritizing and Identifying Strategies to Improve Tehran’s Transport Management in for the Post-Earthquake Crisis Situation

Background and Objectives: Recent earthquakes in Tehran showed that the fear arising from that, immediately caused traffic jam which the most important consequence is delay in relief. The purpose of the present study is to prioritize and identify strategies to improve Tehran's transport management for post-earthquake crisis situations. Method: This is an applied study which has done through de...

متن کامل

joint scheduling and available-to-promise calculation in make-to-forecast production systems

making a rational decision about the free production capacity of a firm requires accurate and comprehensive information in different fields such as unscheduled time of the machines, materials or other required resources status in the firm and the related supply chain. in this study, we try to achieve the needed information through integrating advanced available-to-promise mechanism with schedul...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Operations and Supply Chain Management: An International Journal

سال: 2014

ISSN: 2579-9363

DOI: 10.31387/oscm020011