Adjusting Time for Uncertain Project Assessment
نویسندگان
چکیده
منابع مشابه
Developing Robust Project Scheduling Methods for Uncertain Parameters
A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...
متن کاملA New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets
Uncertainty plays a major role in any project evaluation and management process. One of the trickiest parts of any production project work is its cost and time forecasting. Since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the ...
متن کاملdeveloping robust project scheduling methods for uncertain parameters
a common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. as a result, project managers are often unable to meet the deadline time of the milestones. robust project scheduling is an effective approach in case of uncertainty. upon adopting this approach, schedules are protected against po...
متن کاملProject Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملA UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Economics and Finance
سال: 2016
ISSN: 1916-9728,1916-971X
DOI: 10.5539/ijef.v8n7p275