Adaptive Order Release Planning with Dynamic Lead Times

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multiple objective approach for joint ordering and pricing planning problem with stochastic lead times

The integration of marketing and demand with logistics and inventories (supply side of companies) may cause multiple improvements; it can revolutionize the management of the revenue of rental companies, hotels, and airlines. In this paper, we develop a multi-objective pricing-inventory model for a retailer. Maximizing the retailer's profit and the service level are the objectives, and shorta...

متن کامل

Material Requirement Planning under Fuzzy Lead Times

This paper proposes a fuzzy multi-objective integer linear programming approach to model a material requirement planning (MRP) problem with fuzzy lead times. We incorporate to the crisp MRP model the possibility of occurrence of each one of the possible lead times. Then, an objective function that maximizes the possibility of occurrence of the lead times is considered. By combining this objecti...

متن کامل

Adaptive Planning For Applications With Dynamic Objectives

Planning is commonly viewed as a task to devise a course of action or a plan that conforms as much as possible to a set of goals before acting. The plan will then be used to guide the activities. Most classic planning systems assume a static environment for the planning agents. In a static environment, states remain unchanged between actions, and the outcomes of actions are assumed to be determ...

متن کامل

Manufacturing Simulation Reduces Inventories and Order Lead Times

A lean manufacturing simulation model was created that replicated the existing assembly system as well as a potential system of similar capacity that modified the existing design to incorporate lean manufacturing shop-floor principles. Arena’s manufacturing simulation software generated performance statistics for both systems and measured each system’s resource requirements and performance in t...

متن کامل

Reducing the Research Space of Possible Order Release Dates for Multi-level Assembly Systems under Stochastic Lead Times

This paper proposes tools which will be used to optimize multi-level assembly under lead time uncertainty. One type of finished products and several types of components are considered. We suppose that each component has a fixed unit inventory cost and the finished product has backlogging and inventory holding costs per unit of time. The lead times of components are discrete random variables, an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2019

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2019.11.478