Actin to completion

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Actin to completion

The bud is all in the timing new study by Schenkman et al. on page 829 reveals that the subcellular localization of yeast budding proteins can be determined by the time the genes are expressed. The genes BUD8 and BUD9 are required for establishment of the bipolar budding pattern in normal diploid cells, in which both poles are specified as potential bud sites. Although the two proteins are simi...

متن کامل

Correction/completion of the yeast actin, alanine scan alleles.

IN 1992, the first alanine scanning mutagenesis was performed on the yeast actin gene ACT1 (Wertman et al. 1992). This collection of mutants has proven to be a very useful set of reagents for probing the structure/ function relationships in the actin cytoskeleton. Recently, we realized that several of the most devastating mutants have additional mutations that in several cases lead to complete ...

متن کامل

Computational Approaches to Sentence Completion

This paper studies the problem of sentencelevel semantic coherence by answering SATstyle sentence completion questions. These questions test the ability of algorithms to distinguish sense from nonsense based on a variety of sentence-level phenomena. We tackle the problem with two approaches: methods that use local lexical information, such as the n-grams of a classical language model; and metho...

متن کامل

Evaluating project’s completion time with Q-learning

Nowadays project management is a key component in introductory operations management. The educators and the researchers in these areas advocate representing a project as a network and applying the solution approaches for network models to them to assist project managers to monitor their completion. In this paper, we evaluated project’s completion time utilizing the Q-learning algorithm. So the ...

متن کامل

A New Approach to Approximate Completion Time Distribution Function of Stochastic Pert Networks

The classical PERT approach uses the path with the largest expected duration as the critical path to estimate the probability of completing a network by a given deadline. However, in general, such a path is not the most critical path (MCP) and does not have the smallest estimate for the probability of completion time. The main idea of this paper is derived from the domination structure between ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Cell Biology

سال: 2002

ISSN: 1540-8140,0021-9525

DOI: 10.1083/jcb1565iti4