Accounting for Variability: Identifying Critical Activities as a Supplement to the Critical Path

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

the differential effects of debate and media analysis as relate to enhancing efl learners critical thinking ability and writing performances

critical thinking ability has an important role in education. accordingly, scholars around the world are searching for new ways for teaching and improving students critical thinking ability. in line with the studies in efl contexts supporting the positive relationship between critical thinking and writing performances, this study investigated the differential effects of halverson’s critical thi...

15 صفحه اول

Critical to the H-index as a criterion for evaluation at universities

The use of scientometric indicators to evaluate scholar articles and scientist in academic settings is one of the most challenging topics.(1) These indicators can be influenced by diverse and different factors, including the context in which the assessment activity is performed to measure the productivity and publications of the scientist or scholar. One of these indicators, which is currently...

متن کامل

A Critical View of Global Management Accounting Principles

The aim of this study was to investigate accounting principles of integrated management using a critical approach. To this end, in this study, we used four principles of relevance, influence, value, and trust as the global management accounting principles. The research questions and hypotheses were developed based on the critical thinking that management accounting is not currently convincing b...

متن کامل

Identifying and Measuring Security Critical Path for Uncovering Circuit Vulnerabilities

Hardware is an increasingly attractive attack surface since it controls low-level access to critical resources like cryptographic keys, personally identifiable information, and firmware. Unfortunately, it is difficult to assess the security vulnerabilities of a hardware design, which is a consequence of too few hardware security design tools and metrics. In this work, we describe important secu...

متن کامل

When is the Critical Path Not the Most Critical Path?

This paper challenges the conventional thinking, by proposing a new way to understand and use the term critical-path. At stake is much more than a semantic discussion of terminology. Numerous surveys have confirmed that CPM schedules are used for two primary reasons: project management and dispute resolution. To support either use, the critical-path must be identifiable in a consistent, objecti...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Construction Division and Management

سال: 2022

ISSN: ['1943-7862', '0733-9364']

DOI: https://doi.org/10.1061/(asce)co.1943-7862.0002266