Accelerated simulated annealing algorithm applied to the flexible job shop scheduling problem

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations

In this paper, we considered solving approaches to flexible job shop problems. Makespan is not a good evaluation criterion with overlapping in operations assumption. Accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. As overlapping in operations is a practical assumption in chemical, petrochemical, and gla...

متن کامل

Parallel Simulated Annealing Algorithm for Cyclic Flexible Job Shop Scheduling Problem

This paper deals with scheduling of tasks in cyclic flexible job shop scheduling problem (CFJSSP). We have proposed a new method of computing cyclic time for CFJSSP. This method is based on the known properties of the job shop problem as well as new properties of cyclic scheduling. We have developed two versions of proposed method: sequential and parallel. The parallel version is dedicated to t...

متن کامل

Parallel Simulated Annealing for the Job Shop Scheduling Problem

This paper describes two parallel simulated annealing algorithms for the job shop scheduling problem with the sum of job completion times criterion. Some properties of the problem associated with the block theory have been presented and discussed. These properties allow us to introduce the effective neighborhood based on the adjacent swap type moves. In this paper, an original method for parall...

متن کامل

Job Shop Scheduling by Simulated Annealing

Your use of the JSTOR archive indicates your acceptance of JSTOR's Terms and Conditions of Use, available at http://www.jstor.org/page/info/about/policies/terms.jsp. JSTOR's Terms and Conditions of Use provides, in part, that unless you have obtained prior permission, you may not download an entire issue of a journal or multiple copies of articles, and you may use content in the JSTOR archive o...

متن کامل

a simulated annealing algorithm for multi objective flexible job shop scheduling with overlapping in operations

in this paper, we considered solving approaches to flexible job shop problems. makespan is not a good evaluation criterion with overlapping in operations assumption. accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. as overlapping in operations is a practical assumption in chemical, petrochemical, and gla...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Transactions in Operational Research

سال: 2015

ISSN: 0969-6016

DOI: 10.1111/itor.12195