ABOUT BALANCED AND COORDINATED STIMULATION SYSTEM FOR IT-PROJECT MANAGEMENT

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

IT Project Management Metrics

Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents s...

متن کامل

Introducing the Evaluation Tools for HSE Management System Performance Using Balanced Score Card Model

Background; The performance of the HSE units has various dimensions Leading to different performances. Thus, any industry should be capable of evaluating these systems. The aim of this study was to design a standard questionnaire in the field of performance evaluation of HSE management system employing Balanced Score Card model. Methods; In this study we, first determined the criteria to be ev...

متن کامل

Using Tags for Distributed It Project Management

TAGS is an inter-disciplinary, inter-institutional project which brings together software systems builders and subject-specialists keen to exploit network based learning. It is sponsored by SHEFC as part of a wider C&IT programme [1]. The project has developed a web-based system for group-based project work where all types of resource are groupbased. This paper gives an overview of the user mod...

متن کامل

IT-based approach for effective management of project changes: A change management system (CMS)

In a perfect world, changes will be confined to the planning stages. However, late changes often occur during construction, and frequently cause serious disruption to the project. The need to make changes in a construction project is a matter of practical reality. Even the most thoughtfully planned project may necessitate changes due to various factors. The fundamental idea of any variation man...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Izvestiya Visshikh Uchebnykh Zavedenii. Chernaya Metallurgiya = Izvestiya. Ferrous Metallurgy

سال: 2015

ISSN: 2410-2091,0368-0797

DOI: 10.17073/0368-0797-2013-4-39-42