A two-stage production planning model for perishable products under uncertainty
نویسندگان
چکیده
منابع مشابه
A Two-Stage Production Planning Model for Perishable Products Under Uncertainty
This study addresses the production planning problem for perishable products, in which the cost and shortage of products are minimized subject to a set of constraints such as warehouse space, labor working time and machine time. Using the concept of postponement, the production process for perishable products is differentiated into two phases to better utilize the resources. A two-stage stochas...
متن کاملConsidering a Model for Sustainable Energy Planning Under Uncertainty
In this paper, real options theory is utilized to evaluate the effect of uncertain electricity and CO2 costs on speculation conduct. Methodologically, the allegiance of the newspaper in this appreciation is that uncertainty is not just stopped down as far as stochastic processes and their fluctuation, additionally as far as expected and acknowledged procedures, i.e. the procedures, w...
متن کاملDesigning an integrated production/distribution and inventory planning model of fixed-life perishable products
This paper aims to investigate the integrated production/distribution and inventory planning for perishable products with fixed life time in the constant condition of storage throughout a two-echelon supply chain by integrating producers and distributors. This problem arises from real environment in which multi-plant with multi-function lines produce multi-perishable products with fixed life ti...
متن کاملA Two-Stage Planning Model for Power Scheduling in a Hydro-Thermal System Under Uncertainty
A two-stage stochastic programming model for the shortor mid-term cost-optimal electric power production planning is developed. We consider the power generation in a hydro-thermal generation system under uncertainty in demand (or load) and prices for fuel and delivery contracts. The model involves a large number of mixed-integer (stochastic) decision variables and constraints linking time perio...
متن کاملA two-stage inexact-stochastic programming model for planning carbon dioxide emission trading under uncertainty
In this study, a two-stage inexact-stochastic programming (TISP) method is developed for planning carbon dioxide (CO2) emission trading under uncertainty. The developed TISP incorporates techniques of interval-parameter programming (IPP) and two-stage stochastic programming (TSP) within a general optimization framework. The TISP can not only tackle uncertainties expressed as probabilistic distr...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Uncertain Supply Chain Management
سال: 2017
ISSN: 2291-6822,2291-6830
DOI: 10.5267/j.uscm.2017.1.002