A Two-Stage Model for Project Optimization in Transportation Infrastructure Management System

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A fuzzy multi-objective model for a project management problem

In this research, the multi-objective project management decision problem with fuzzy goals and fuzzy constraints are considered. We constitute α-cut approach and two various fuzzy goal programming solution methods for solving the Multi-Objective Project Management (MOPM) decision problem under fuzzy environments. The Interactive fuzzy multi-objective linear programming (i-FMOLP) and Weighted Ad...

متن کامل

Resilient Project Management, A New Approache to Develop Project Management Knowledge (Case Study: Infrastructure Civil Projects Management)

Accepetance of the fact that the working context of civil projects is challenging can enhance the resiliency capacity and will increase the project management concentration for improving and developing the software and hardware capabilities to facilitate project success achievement. This article is documented based on a research results in macro-hydropower plants projects management context to ...

متن کامل

A two-stage pricing and inventory optimization model for both ameliorating and deteriorating items in a competing environment

This paper develops a pricing and inventory model of a supply chain composing one supplier and two manufacturers in which the supplier sells its product to two competing manufacturers. Each manufacturer faces a deterministic demand that depends on his/her own and the other competitor sale price. Selling price for the supplier is time dependent and increment function.Both amelioration and deteri...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2014

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2014/914515