A two-phase fuzzy programming model for a complex bi-objective no-wait flow shop scheduling
نویسندگان
چکیده
منابع مشابه
Solving Re-entrant No-wait Flow Shop Scheduling Problem
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملA heuristic for no-wait flow shop scheduling
This paper presents an efficient heuristic method to minimize total flow time in no-wait flow shop scheduling. It is based on the assumption that the priority of a job in the initial sequence is given by the sum of its processing times on the bottleneck machines. Empirical results demonstrate the superiority of the proposed method over the best-known heuristics in the literature, while remainin...
متن کاملA Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production
In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...
متن کاملA bi-objective model for the assembly flow shop scheduling problem with sequence dependent setup times and considering energy consumption
متن کامل
A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times
This paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. In the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). However,, two significant criteria for each schedule in stochastic models are: expectable m...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: international journal of industrial engineering computations
سال: 2012
ISSN: 1923-2926,1923-2934
DOI: 10.5267/j.ijiec.2012.03.005