A two-echelon newsvendor problem with limited budget and capacity
نویسندگان
چکیده
منابع مشابه
Two-echelon Repairable Item Inventory System with Limited Repair Capacity under Nonstationary Demands
We study a repairable item inventory system under limited repair capacity and nonstationary Poisson demands, motivated by corrective maintenance of military equipment. Our goal is to minimize the cost of both spare and repair resource allocation. We propose an efficient analytical model that combines optimization modeling and queuing theory.
متن کاملOn Two-Echelon Multi-Server Queue with Balking and Limited Intermediate Buffer
In this paper we study two echelon multi-server tandom queueing systems where customers arrive according to a poisson process with two different rates. The service rates at both echelons are independent of each other. The service times of customers is assumed to be completed in two stages. The service times at each stage are exponentially distributed. At the first stage, the customers may balk ...
متن کاملThe risk-averse newsvendor problem with random capacity
This paper examines a single-period inventory problem with random capacity and demand, where the loss-averse preference is adopted to describe the newsvendor’s decision-making behavior. When the loss-averse newsvendor orders, the supplier has some random replenishment capacity. He will choose an order quantity to maximize his expected utility. The newsvendor’s optimal ordering policy is obtaine...
متن کاملA Hybrid Algorithm for a Two-Echelon Location- Routing Problem with Simultaneous Pickup and Delivery under Fuzzy Demand
Location-Routing Problem (LRP) emerges as one of the hybrid optimization problems in distribution networks in which, total cost of the system would be reduced significantly by simultaneous optimization of locating a set of facilities among candidate locations and routing vehicles. In this paper, a mixed integer linear programming model is presented for a two-echelon location-routing problem wit...
متن کاملJOINT ECONOMIC LOT SIZING PROBLEM IN A TWO ECHELON PRODUCTION SYSTEM WITH FINITE PRODUCTION RATE AND LEAD TIME
In this study, a two-echelon supplier-manufacturer system with finite production rate and lead time is proposed. It is assumed that shortage is not permitted and the lot size of manufacturer (second echelon) is m-factors of the lot size of supplier (first echelon) and supplier can supply the manufacturer’s lot size in several shipments in each cyc...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Scientia Iranica
سال: 2020
ISSN: 2345-3605
DOI: 10.24200/sci.2020.52992.3001