A three stage production system is considered in this paper. There are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. Suppose that a number of products of different kinds are ordered. Each product is assembled with a set of several parts. At first the parts are produced in the first stage with parallel machines a...
متن کاملA genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملmulti-objective scheduling problem in a three-stage production system
a three stage production system is considered in this paper. there are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. suppose that a number of products of different kinds are ordered. each product is assembled with a set of several parts. at first the parts are produced in the first stage with parallel machines a...
متن کاملIntegrated Procurement, Production and Delivery Scheduling in a Generalized three Stage Supply Chain
In this research, we investigate a three-stage supply chain with one supplier, several manufacturers and multiple retailers where the supplier provides a common raw material to each manufacturer, who in turn uses a single stage production facility to convert it into final products that are delivered at fixed lot sizes to retailers. An integrated economic procurement, production, and delivery mo...
متن کاملA Three-Stage Optimization Algorithm for the Stochastic Parallel Machine Scheduling Problem with Adjustable Production Rates
We consider a parallel machine scheduling problem with random processing/setup times and adjustable production rates. The objective functions to be minimized consist of two parts; the first part is related with the due date performance (i.e., the tardiness of the jobs), while the second part is related with the setting of machine speeds. Therefore, the decision variables include both the produc...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2019
ISSN: 2405-8963
DOI: 10.1016/j.ifacol.2019.06.166