A Systematical Framework of Schedule Risk Management for Power Grid Engineering Projects’ Sustainable Development

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System

Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...

متن کامل

Systems Engineering and Management for Sustainable Development

The choice and the presentation of the facts contained in this publication and the opinions expressed therein are not necessarily those of UNESCO and do not commit the Organization. The designations employed and the presentation of material throughout this publication do not imply the expression of any opinion whatsoever on the part of UNESCO concerning the legal status of any country, territor...

متن کامل

Development of framework for sustainable Lean implementation: an ISM approach

The survival of any organization depends upon its competitive edge. Even though Lean is one of the most powerful quality improvement methodologies, nearly two-thirds of the Lean implementations results in failures and less than one-fifth of those implemented have sustained results. One of the most significant tasks of top management is to identify, understand and deploy the significant Lean pra...

متن کامل

Community-Based disaster risk Management towards Sustainable Development

Background and Purpose:With the rise of natural disasters, different societies have continually sought to discover solutions to control or minimize the damage caused by unexpected events and to actually manage disasters. In the past few decades, the need for social participation to reduce disasters has increased. The community-based disaster  risk management framework is growing. Therefore, thi...

متن کامل

Development of Human Resource Management Model with Sustainable Organizational Development Approach in Power Industry

The purpose of the present study is to develop a human resource management model with a sustainable organizational development approach. This research was conducted in the framework of a qualitative approach using Grounded theory research method. The statistical population of the study consisted of managers working in the electrical industry and were selected through theoretical and purposeful ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2014

ISSN: 2071-1050

DOI: 10.3390/su6106872