A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

a contrastive study of rhetorical functions of citation in iranian and international elt scopus journals

writing an academic article requires the researchers to provide support for their works by learning how to cite the works of others. various studies regarding the analysis of citation in m.a theses have been done, while little work has been done on comparison of citations among elt scopus journal articles, and so the dearth of research in this area demands for further investigation into citatio...

a study on thermodynamic models for simulation of 1,3 butadiene purification columns

attempts have been made to study the thermodynamic behavior of 1,3 butadiene purification columns with the aim of retrofitting those columns to more energy efficient separation schemes. 1,3 butadiene is purified in two columns in series through being separated from methyl acetylene and 1,2 butadiene in the first and second column respectively. comparisons have been made among different therm...

a time-series analysis of the demand for life insurance in iran

با توجه به تجزیه و تحلیل داده ها ما دریافتیم که سطح درامد و تعداد نمایندگیها باتقاضای بیمه عمر رابطه مستقیم دارند و نرخ بهره و بار تکفل با تقاضای بیمه عمر رابطه عکس دارند

reflections on taught courses of the iranian ma program in english translation: a mixed-methods study

the issue of curriculum and syllabus evaluation and revision has been in center of attention right from when curriculum came into attention of educational institutions. thus everywhere in the world in educational institutions curricula and syllabi are evaluated and revised based on the goals, the needs, existing content, etc.. in iran any curriculum is designed in a committee of specialists and...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Korean Journal of Construction Engineering and Management

سال: 2015

ISSN: 2005-6095

DOI: 10.6106/kjcem.2015.16.3.165