A Study on Intuitionistic Fuzzy Critical Path Problems Through Centroid Based Ranking Method

نویسندگان

چکیده

In this study the intuitionistic fuzzy version of critical path method has been proposed to solve networking problems with uncertain activity durations. Intuitionistic set [1] is an extension theory [2] unlike set, it focuses on degree belonging, nonbelonging or non-membership function and hesitancy which helps decision maker adopt best among worst cases. Trapezoidal triangular numbers are utilized describe task durations project network. Here trapezoidal converted into their corresponding parametric form applying arithmetic operations a new ranking based numbers, vagueness reduced completion duration obtained. The authentication can be checked by comparing obtained results available in pieces literature.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Fuzzy Critical Path Method Based on a New Approach of Ranking Fuzzy Numbers using Centroid of Centroids

The Critical Path Method (CPM) is useful for planning and control of complex projects. The CPM identifies the critical activities in the critical path of an activity network. The successful implementation of CPM requires the availability of clear determined time duration for each activity. However, in practical situations this requirement is usually hard to fulfil since many of activities will ...

متن کامل

A Study on Fuzzy Critical Path Method Based On Metric Distance Ranking Of Fuzzy Numbers With Conventional Method

In this paper Algorithm is presented to perform critical path method in a fuzzy environment. The trapezoidal fuzzy number given by decision makers or characterized by historical data are utilized to assess the activity time in a project network. The fuzzy shortest path problem thus obtained is compared with conventional method.

متن کامل

Fuzzy critical path analysis based on centroid of centroids of fuzzy numbers and new subtraction method

This paper proposes a new method to solve fuzzy critical path problems for a project network with activity times being normalised trapezoidal fuzzy numbers. is solved successfully to demonstrate the validity of the proposed approach.

متن کامل

Ranking of Intuitionistic Fuzzy Number by Centroid Point

The notion of Intuitionistic Fuzzy Numbers (IFNs) has been improved in many decision making problems. Ranking of IFNs is one of the techniques that conceptualize IFNs to illustrate order or preference in decision making. Ranking of IFNs plays a very important role in multicriteria decision making, optimization and in many different fields but ranking of IFNs is not a very easy process. As far a...

متن کامل

A Compromise Ratio Ranking Method of Triangular Intuitionistic Fuzzy Numbers\ and Its Application to MADM Problems

Triangular intuitionistic fuzzy numbers (TIFNs) is a special case of intuitionistic fuzzy (IF) set and the ranking of TIFNs is an important problem. The aim of this paper is to develop a new methodology for ranking TIFNs by using multiattribute decision making methods (MADM). In this methodology, the value and ambiguity indices of TIFNs may be considered as the attributes and the TIFNs in compa...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematics and Statistics

سال: 2022

ISSN: ['2332-2144', '2332-2071']

DOI: https://doi.org/10.13189/ms.2022.100619