A Study of Rescheduling Strategies for the Quay Crane Scheduling Problem under Random Disruptions

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem

Decision makers must face the dynamism and uncertainty of real-world environments when they need to solve the scheduling problems. Different incidences or breakdowns, for example, initial data could change or some resources could become unavailable, may eventually cause the infeasibility of the obtained schedule. To overcome this issue, a robust model and a proactive approach are presented for ...

متن کامل

Addressing a Coordinated Quay Crane Scheduling and Assignment Problem by Red Deer Algorithm

Nowadays, there is much attention for planning of container terminals in the global trade centers. The high cost of quay cranes motivates both scholars and industrial practitioners especially in the last decade to develop novel optimization models to address this dilemma. This study proposes a coordinated optimization model to cover both Quay Crane Scheduling Problem (QCSP) and Quay Crane Assig...

متن کامل

Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals

In this work, we focus on the integrated planning of the following problems faced within the context of seaside operations at container terminals: berth allocation, quay crane assignment, and quay crane scheduling. First, we formulate a new binary integer linear program for the integrated solution of the berth allocation and quay crane assignment problems called BACAP. Then we extend it by inco...

متن کامل

A Branch-and-Cut Algorithm for the Quay Crane Scheduling Problem in a Container Terminal

The quay crane scheduling problem consists of determining a sequence of unloading and loading movements for cranes assigned to a vessel, in order to minimize the vessel completion time as well as the crane idle times. Idle times originate from interferences between cranes since these roll on the same rails and a minimum safety distance must be maintained between them. The productivity of contai...

متن کامل

A modified generalized extremal optimization algorithm for the quay crane scheduling problem with interference constraints

The quay crane scheduling problem (QCSP) determines the handling sequence of tasks at ship bays by a set of cranes assigned to a container vessel such that the vessel’s service time is minimized. A number of heuristics or metaheuristics have been proposed to obtain the near-optimal solutions to overcome the NP-hardness of the problem. In this article, the idea of generalized extremal optimizati...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Inteligencia Artificial

سال: 2014

ISSN: 1988-3064,1137-3601

DOI: 10.4114/intartif.vol17iss54pp35-47