A strategic model of job arrivals to a single machine with earliness and tardiness penalties

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving the Single Machine Problem with Quadratic Earliness and Tardiness Penalties

  Nowadays, scheduling problems have a considerable application in production and service systems. In this paper, we consider the scheduling of n jobs on a single machine assuming no machine idleness, non-preemptive jobs and equal process times. In many of previous researches, because of the delivery dalays and holding costs, earliness and tardiness penalties emerge in the form of linear combin...

متن کامل

Single Machine Common Due Date with Job Dependent Earliness and Tardiness Penalties Problem Using Neural Network

We consider the problem of scheduling of n jobs to minimize the total earliness and tardiness penalty. The scheduling objective is to minimize the sum of job dependent earliness and tardiness penalties.. After determining the scheduling for single machine common due date, using neural network, the result shows that the neural network solution performs very well.

متن کامل

Single-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production

Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...

متن کامل

A Scheduling Model of Flexible Manufacturing System to Reduce Waste and Earliness/Tardiness Penalties

Nowadays, flexible manufacturing system (FMS) is introduced as a response to the competitive environment. Scheduling of FMS is more complex and more difficult than the other scheduling production systems. One of the main factors in scheduling of FMS is variable time of taking orders from customers, which leads to a sudden change in the manufacturing process. Also, some problems are created in p...

متن کامل

Machine scheduling with earliness, tardiness and non-execution penalties

The study of scheduling problems with earliness–tardiness (E/T) penalties is motivated by the just-in-time (JIT) philosophy, which supports the notion that earliness, as well as tardiness, should be discouraged. In this work, we consider several scheduling problems. We begin by generalizing a known polynomial time algorithm that calculates an optimal schedule for a given sequence of tasks, on a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IISE Transactions

سال: 2018

ISSN: 2472-5854,2472-5862

DOI: 10.1080/24725854.2017.1395098