A stockyard planning problem
نویسندگان
چکیده
منابع مشابه
A reclaimer scheduling problem arising in coal stockyard management
We study a number of variants of an abstract scheduling problem inspired by the scheduling of reclaimers in the stockyard of a coal export terminal. We analyze the complexity of each of the variants, providing complexity proofs for some and polynomial algorithms for others. For one, especially interesting variant, we also develop a constant factor approximation algorithm.
متن کاملIntegration of Genetic Algorithms and Simulation for Stockyard Layout Planning
This paper describes the development of a process simulation model and integration of the Genetic Algorithms (GA) with the model as optimisation techniques using a case study of stockyard layout planning in precast concrete products industry. Genetic algorithms have been used for two purposes: firstly, to identify clusters of concrete products by analysing sales historical data such that freque...
متن کاملSolving a generalized aggregate production planning problem by genetic algorithms
This paper presents a genetic algorithm (GA) for solving a generalized model of single-item resource-constrained aggregate production planning (APP) with linear cost functions. APP belongs to a class of pro-duction planning problems in which there is a single production variable representing the total production of all products. We linearize a linear mixed-integer model of APP subject to hiring...
متن کاملStochastic Facility Layout Planning Problem: A Metaheuristic and Case Study
Facility layout is one of the most important Operations Management problems due to its direct impact on the financial performance of both private and public firms. Facility layout problem (FLP) with stochastic parameters, unequal area facilities, and grid system modeling is named GSUA-STFLP. This problem has not been worked in the literature so that to solve GSUA-STFLP is our main contribution....
متن کاملA multi-objective evolutionary approach for integrated production-distribution planning problem in a supply chain network
Integrated production-distribution planning (PDP) is one of the most important approaches in supply chain networks. We consider a supply chain network (SCN) to consist of multi suppliers, plants, distribution centers (DCs), and retailers. A bi-objective mixed integer linear programming model for integrating production-distribution designed here aim to simultaneously minimize total net costs in ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: EURO Journal on Transportation and Logistics
سال: 2012
ISSN: 2192-4376
DOI: 10.1007/s13676-012-0011-z