A Stochastic-Robust Approach for Resilient Microgrid Investment Planning Under Static and Transient Islanding Security Constraints

نویسندگان

چکیده

When planning the investment in Microgrids (MGs), usually static security constraints are included to ensure their resilience and ability operate islanded mode. However, unscheduled islanding events may trigger cascading disconnections of Distributed Energy Resources (DERs) inside MG due transient response, leading a partial or full loss load. In this paper, min-max-min, hybrid, stochastic-robust model is proposed obtain resilient considering both High-Impact-Low-Frequency (HILF) Low-Impact-High-Frequency (LIHF) uncertainties. The HILF uncertainty pertains after disastrous event, LIHF relates correlated loads DER generation, characterized by set scenarios. under types ensured incorporating into model. inclusion response leads min-max-min problem with non-linear dynamic frequency that cannot be solved directly available optimization tools. Thus, three-stage solution approach find optimal plan. performance algorithm tested on CIGRE 18-node distribution network.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A stochastic model for operating room planning under uncertainty and equipment capacity constraints

In the present economic context, the operating theater is considered as a critical activity in health care management. This paper describes a model for operating room (OR) planning under constraint of a unique equipment. At first level we schedule elective surgeries under the uncertainty of using a unique equipment. At the second level we consider emergency surgeries, and at the third le...

متن کامل

Preallocation and Planning under Stochastic Resource Constraints

Resource constraints frequently complicate multi-agent planning problems. Existing algorithms for resource-constrained, multi-agent planning problems rely on the assumption that the constraints are deterministic. However, frequently resource constraints are themselves subject to uncertainty from external influences. Uncertainty about constraints is especially challenging when agents must execut...

متن کامل

Integrated planning for blood platelet production: a robust optimization approach

Perishability of blood products as well as uncertainty in demand amounts complicate the management of blood supply for blood centers. This paper addresses a mixed-integer linear programming model for blood platelets production planning while integrating the processes of blood collection as well as production/testing, inventory control and distribution. Whole blood-derived production methods for...

متن کامل

A Stochastic Programming Approach for a Multi-Site Supply Chain Planning in Textile and Apparel Industry under Demand Uncertainty

In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, t...

متن کامل

Planning under Time Constraints in Stochastic Domains

We provide a method based on the theory of Markov decision processes for e cient planning in stochastic domains Goals are encoded as reward functions expressing the desirability of each world state the planner must nd a policy mapping from states to actions that maximizes future rewards Standard goals of achievement as well as goals of maintenance and prioritized combinations of goals can be sp...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Smart Grid

سال: 2022

ISSN: ['1949-3053', '1949-3061']

DOI: https://doi.org/10.1109/tsg.2022.3146193