A genetic algorithm approach for open-pit mine production scheduling

In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...

متن کامل

Commodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method

Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...

متن کامل

A continuous model for open pit mine planning∗

This paper proposes a new mathematical model for the open pit mine planning problem, based on continuous functional analysis. The traditional models for this problem have been constructed by using discrete 0−1 decision variables, giving rise to large-scale combinatorial and Mixed Integer Programming (MIP) problems. Instead, we use a continuous approach which allows for a refined imposition of s...

متن کامل

commodity price uncertainty propagation in open-pit mine production planning by latin hypercube sampling method

production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (npv) subject to some operational and technical constraints. this process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. the commodity price uncertainty is among ...

متن کامل

A continuous framework for open pit mine planning

This paper proposes a newmathematical framework for the open pit mine planning problem, based on continuous functional analysis. The main challenge for engineers is to determine a sequence of nested profiles maximizing the net present value of the mining operation. The traditional models for this problem have been constructed by using binary decision variables, giving rise to large-scale combin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Resources Policy

سال: 2018

ISSN: 0301-4207

DOI: 10.1016/j.resourpol.2018.02.006