A single-consignor multi-consignee multi-item model with permissible payment delay, delayed shipment and variable lead time under consignment stock policy
نویسندگان
چکیده
This article proposes a two-level fuzzy supply chain inventory model, in which single consignor delivers multiple items to the consignees with consignment stock agreement. The lead time is incorporated into model and considered variable for obtaining optimal replenishment decisions. In addition, crashing cost employed reduce duration. investigates four different cases under controllable analyze best strategy, focusing on two delays such as delay-in-payments delay-in-shipment. all cases, associated costs are treated trapezoidal number, signed distance method defuzzify cost. An efficient optimization technique adopted find solution chain. Four numerical experiments conducted illustrate cases. Any one of these experimental results will provide ideal performance business policy. Finally, managerial insights, conclusion future direction this provided.
منابع مشابه
A Multi-supplier Inventory Model with Permissible Delay in Payment and Discount
This paper proposes a multi-supplier multi-product inventory model in which the suppliers have unlimited production capacity, allow delayed payment, and offer either an all-unit or incremental discount. The retailer can delay payment until after they have sold all the units of the purchased product. The retailer’s warehouse is limited, but the surplus can be stored in a rented warehouse at a...
متن کاملMulti-item inventory model with probabilistic demand function under permissible delay in payment and fuzzy-stochastic budget constraint: A signomial geometric programming method
This study proposes a new multi-item inventory model with hybrid cost parameters under a fuzzy-stochastic constraint and permissible delay in payment. The price and marketing expenditure dependent stochastic demand and the demand dependent the unit production cost are considered. Shortages are allowed and partially backordered. The main objective of this paper is to determine selling price, mar...
متن کاملAn EOQ Model for a Deteriorating Item with Time Dependent Quadratic Demand and Variable Deterioration under Permissible Delay in Payment
In a recent paper, Khanra, Ghosh and Chaudhuri’s (2011) presented an EOQ model for a deteriorating item with time dependent quadratic demand under permissible delay in payment. Deterioration considered in most of the EOQ models is constant, while in most of the practical cases the deterioration rate increases with time. This work is motivated by Khanra, Ghosh and Chaudhuri’s (2011) paper extend...
متن کاملa multi-product inventory control model with imperfect production process and rework under delayed payment policy
the traditional economic production quantity (epq) model assumes that during the production process no imperfect item is produced. but in the real production system, due to imperfect production process or other factors, imperfect quality items may be produced. furthermore, it is well-known that the total production-inventory costs can be reduced by reworking the imperfect quality items produced...
متن کاملa multi-supplier inventory model with permissible delay in payment and discount
this paper proposes a multi-supplier multi-product inventory model in which the suppliers have unlimited production capacity, allow delayed payment, and offer either an all-unit or incremental discount. the retailer can delay payment until after they have sold all the units of the purchased product. the retailer’s warehouse is limited, but the surplus can be stored in a rented warehouse at a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Rairo-operations Research
سال: 2021
ISSN: ['1290-3868', '0399-0559']
DOI: https://doi.org/10.1051/ro/2021113