A simulation study for a low carbon consumption HVAC project using EnergyPlus
نویسندگان
چکیده
منابع مشابه
a study on thermodynamic models for simulation of 1,3 butadiene purification columns
attempts have been made to study the thermodynamic behavior of 1,3 butadiene purification columns with the aim of retrofitting those columns to more energy efficient separation schemes. 1,3 butadiene is purified in two columns in series through being separated from methyl acetylene and 1,2 butadiene in the first and second column respectively. comparisons have been made among different therm...
a study on rate making and required reserves determination in reinsurance market: a simulation
reinsurance is widely recognized as an important instrument in the capital management of an insurance company as well as its risk management tool. this thesis is intended to determine premium rates for different types of reinsurance policies. also, given the fact that the reinsurance coverage of every company depends upon its reserves, so different types of reserves and the method of their calc...
Modeling and Simulation of Operational Faults of Hvac Systems Using Energyplus
HVAC operations play a significant role among various driving factors to improve energy performance of buildings. Extensive researches have been conducted on the design efficiencies and control strategies of HVAC system, but very few focused on the impacts of its operational faults on the building energy efficiency. Modeling and simulation of operational faults can lead to better understandings...
متن کاملSimulation of Energy Use in Uk Supermarkets Using Energyplus
This paper investigates the interaction between supermarket heating, ventilation and air conditioning and refrigeration systems through simulation in EnergyPlus. This interaction has been studied by modelling a generic UK supermarket. The impact on the sum of HVAC and refrigeration energy consumption due to changes in a range of operating conditions was studied. These include the effect of alte...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Low-Carbon Technologies
سال: 2012
ISSN: 1748-1317,1748-1325
DOI: 10.1093/ijlct/cts036