This paper presents a simulation approach for employee days-off scheduling when the daily labour demands are random variables. A simulation model is constructed, and a case study application of the proposed approach is described. The model recognizes limited staff availability, stochastic workload variability, and policy restrictions on the choice of employee work schedules. The model has been ...
متن کاملA Bayesian stochastic programming approach to an employee scheduling problem
Bayesian forecasting models provide distributional estimates for random parameters, and relative to classical schemes, have the advantage that they can rapidly capture changes in nonstationary systems using limited historical data. Unlike deterministic optimization, stochastic programs explicitly incorporate distributions for random parameters in the model formulation, and thus have the advanta...
متن کاملAn assessment of a days off decomposition approach to personnel shift scheduling
This paper studies a two-phase decomposition approach to solving the personnel scheduling problem. The first phase creates a days-off-schedule, indicating working days and days off for each employee. The second phase assigns shifts to the working days in the days-off-schedule. This decomposition is motivated by the fact that personnel scheduling constraints are often divided into two categories...
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملOptimum workforce scheduling under the (14, 21) days-off timetable
An efficient optimum solution is presented for a real-life employee daysoff scheduling problem with a three-week cycle. Over a given work cycle, each worker is given 14 successive workdays and 7 successive off days. This three-week days-off timetable is referred to as the (14, 21) schedule. Given different labor demands for each day of the week, the primary objective is to minimize the number o...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Modelling and Simulation
سال: 2007
ISSN: 1925-7082
DOI: 10.2316/journal.205.2007.1.205-4281