A simple approach to fuzzy critical path analysis in project networks

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A simple approach to fuzzy critical path analysis in project networks

In this paper, we propose a new approach to critical path analysis in a project network whose activity times are uncertain. The uncertain parameters in the project network are represented by fuzzy numbers. We use fuzzy arithmetic and a fuzzy ranking method to determine the fuzzy critical path of the project network without converting the fuzzy activity times to classical numbers. The proposed m...

متن کامل

Solving Critical Path Problem in Project Network by a New Enhanced Multi-objective Optimization of Simple Ratio Analysis Approach with Interval Type-2 Fuzzy Sets

Decision making is an important issue in business and project management that assists finding the optimal alternative from a number of feasible alternatives. Decision making requires adequate consideration of uncertainty in projects. In this paper, in order to address uncertainty of project environments, interval type-2 fuzzy sets (IT2FSs) are used. In other words, the rating of each alternativ...

متن کامل

A New Approach to find Total Float time and Critical Path in a fuzzy Project Network

The purpose of the critical path method (CPM) is to identify the critical activities in the critical path of an activity network. In the real world for many projects we have to use human judgment for estimating the duration of activities. However, the unknowns or vagueness about the time duration for activities in network planning, has led to the development of fuzzy CPM. A way to deal with thi...

متن کامل

A New Method for Fuzzy Critical Path Analysis in Project Networks with a New Representation of Triangular Fuzzy Numbers

The method for finding fuzzy optimal solution of fully fuzzy critical path (FFCP) problems i.e., critical path problems in which all the parameters are represented by fuzzy numbers, is at best scant; possibly non-existent. In this paper, a method is proposed to find the fuzzy optimal solution of FFCP problems, together with a new representation of triangular fuzzy numbers. This paper will show ...

متن کامل

Solving Fully Fuzzy Critical Path Analysis in Project Networks Using Linear Programming Problems

A new method for finding fuzzy optimal solution, the maximum total completion fuzzy time and fuzzy critical path for the given fully fuzzy critical path (FFCP) problems using crisp linear programming (LP) problem is proposed. In this proposed method, all the parameters are represented by triangular fuzzy number. The fuzzy optimal solution of the FFCP problems obtained by the proposed method, do...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Applied Mathematical Modelling

سال: 2008

ISSN: 0307-904X

DOI: 10.1016/j.apm.2007.04.009