A semi-infinite programming model for earliness/tardiness production planning with a genetic algorithm

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A parallel algorithm for semi-infinite programming

The implementation results of an algorithm designed to solve semi-in&nite programming problems are reported. Due to its computational intensity, parallelisation is used in two stages of the algorithm—for evaluating the global optimum and for checking the feasibility of constraints. The algorithms are parallelised using MPI—the message passing interface. The algorithms are then applied to engine...

متن کامل

A numerical approach for optimal control model of the convex semi-infinite programming

In this paper, convex semi-infinite programming is converted to an optimal control model of neural networks and the optimal control model is solved by iterative dynamic programming method. In final, numerical examples are provided for illustration of the purposed method.

متن کامل

Robot trajectory planning with semi-infinite programming

In this paper we describe how robot trajectory planning can be formulated as a semi-infinite programming (SIP) problem. The formulation as a SIP problem allowed us to treat the problem with one of the three main classes of methods for solving SIP, the discretization class. Two of the robotics trajectory planning problems formulated were coded in the SIPAMPL [1] environment which is publicly ava...

متن کامل

A Mathematical Programming Model and Genetic Algorithm for a Multi-Product Single Machine Scheduling Problem with Rework Processes

In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem.  Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...

متن کامل

A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Computers & Mathematics with Applications

سال: 1996

ISSN: 0898-1221

DOI: 10.1016/0898-1221(96)00034-x