A mathematical programming model for scheduling steelmaking-continuous casting production
This paper presents a mathematical model, based on the just-in-time (JIT) idea, for solving machine con ̄icts in steelmaking-continuous casting (SCC) production scheduling in the computer integrated manufacturing system (CIMS) environment. The model is developed as a non-linear model based on actual production situations, considering both punctual delivery and production operation continuity. It...
متن کاملDynamic Optimal Scheduling Method and Its Application for Converter Fault in Steelmaking and Continuous Casting Production Process
In steelmaking and continuous casting (SMCC) production process, converter fault can lead to unexpected changes to the pre-specified converter-continuous caster production mode so that the original scheduling plan becomes unrealizable. In this paper, the dynamic scheduling problem in response to converter fault is firstly analyzed. This is then followed by the establishment of a novel multi-obj...
متن کاملSimulating Schedule Optimization Problem in Steelmaking Continuous Casting Process
This paper establishes the models of the steelmaking continuous casting (SCC) process, and proposed the improved algorithms for this problem. The simulation results of a computerized scheduling system are also given to prove the model. The SCC process scheduling problem is very difficult to get a good performance solution in practice. The scheduling of the SCC process requires that each cast pl...
متن کاملA Hybrid Modeling for Continuous Casting Scheduling Problem
This paper deals with a multi-agent-based interval type-2 fuzzy (IT2F) expert systemfor scheduling steel continuous casting. Continuous caster scheduling is a complex and extensiveprocess that needs expert staff. In this study, a distributed multi-agent-based structure is proposed as asolution. The agents used herein can cooperate with each other via various communication protocols.To facilitat...
متن کاملComplete Modification Rescheduling Method and Its Application for Steelmaking and Continuous Casting
Delayed processing time and machine failures upset the plan in steelmaking-continuous casting (SCC) production, which make production plan infeasible. The manual repairing cannot satisfy objectives of quick response and optimal scheduling. The practical rescheduling with 1-4 refining stages cannot abstract as three stages hybrid flow shop (HFS). A method is presented for the rescheduling proble...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2018
ISSN: 2405-8963
DOI: 10.1016/j.ifacol.2018.09.295