A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
نویسندگان
چکیده
Abstract The ever increasing demand for container transportation has led to the congestion of maritime terminals in world. In this work, two interrelated problems berth and quay crane scheduling are considered an integrated multiobjective mathematical model. A special character model is that arrival times vessels failure (working) cranes not deterministic can vary based on some scenarios. Hence, a robust devised problem having three objectives minimising deviations from target berthing locations as well departure delays all vessels. This optimisation seeks minimise value regarding An exact solution approach ???? -constraint method by Gurobi software applied. Moreover, complexity problem, Simulated Annealing (SA) metaheuristics, namely Multi-Objective (MOSA) Pareto (PSA) adapted with novel encoding scheme. methods compared metrics statistical test. advantage integration examined well.
منابع مشابه
Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
In this work, we focus on the integrated planning of the following problems faced within the context of seaside operations at container terminals: berth allocation, quay crane assignment, and quay crane scheduling. First, we formulate a new binary integer linear program for the integrated solution of the berth allocation and quay crane assignment problems called BACAP. Then we extend it by inco...
متن کاملRobust Scheduling for Berth Allocation and Quay Crane Assignment Problem
Decision makers must face the dynamism and uncertainty of real-world environments when they need to solve the scheduling problems. Different incidences or breakdowns, for example, initial data could change or some resources could become unavailable, may eventually cause the infeasibility of the obtained schedule. To overcome this issue, a robust model and a proactive approach are presented for ...
متن کاملQuay Cranes and Yard Trucks Scheduling Problem at Container Terminals
A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...
متن کاملOptimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
We focus on the integrated seaside operations in container terminals, namely the integration of berth allocation, quay crane assignment and quay crane scheduling problems. We first develope a mixed-integer linear programming formulation. Then, we propose an efficient cutting plane algorithm based on a decomposition scheme. Our approach deals with berthing positions of the vessels and their assi...
متن کاملA Quay Crane Scheduling Model in Container Terminals
This paper discusses the problem of scheduling quay cranes, the most important equipment in port terminals. A simulation model is developed for evaluating time of quay cranes. Then a dynamic scheduling model using objective programming for quay cranes is developed based on genetic algorithm approach. Finally, numerical experiments on a specific container terminal are made for propose approach. ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Annals of Mathematics and Artificial Intelligence
سال: 2021
ISSN: ['1573-7470', '1012-2443']
DOI: https://doi.org/10.1007/s10472-021-09743-5