A Risk Performance Measurement System for the Mega-Project

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A note on‘‘A case study approach for developing a project performance evaluation system”

The major aim of this research is benchmarking Honeywell Federal Manufacturing &Technologies projects using Data Envelopment Analysis (DEA) technique and to compare the results with that of published recently in Qing Cao, James J. Hoffman Qing Cao, James J. Hoffman. (2011). A case study approach for developing a project performance evaluation system. International Journal of Project Managem...

متن کامل

Towards a multi-dimensional project Performance Measurement System

This paper discusses the difficulty of controlling a complex project caused by the great number of performance indicators. The problem studied is how to allow project managers to better control the performance of their projects. From a literature review we noted several critical aspects to this problem: there are many dimensions for evaluating project performance (cost, time, quality, risk, etc...

متن کامل

Software development risk and project performance measurement: Evidence in Korea

As more US companies outsource their software projects overseas, they find that it is more challenging to control software development risk in countries with dissimilar IT capabilities. Using data collected from software projects developed in Korea, we investigate the impacts of specific risk management strategies and residual performance risk on objective performance measures such as cost and ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Architectural research

سال: 2010

ISSN: 1229-6163

DOI: 10.5659/aikar.2010.12.1.57