A quantitative risk assessment methodology for construction project
نویسندگان
چکیده
منابع مشابه
Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملProject Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملProject Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملA MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS
Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. ...
متن کاملThe Conceptual Framework for Construction Project Risk Assessment
The environment in which the project schedule will be executed is far from being static. Projects are subject to various uncertainties that have negative effect on activity durations. This is most apparent in the case of construction projects. The frequency and impact of risks depend on project-specific, contractor-specific and location-specific conditions. Identifying critical sources of risk ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sādhanā
سال: 2018
ISSN: 0256-2499,0973-7677
DOI: 10.1007/s12046-018-0846-6