A progressive study into offshore wind farm maintenance optimisation using risk based failure analysis

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimisation of maintenance routing and scheduling for offshore wind farms

An optimisation model and a solution method for maintenance routing and scheduling at offshore wind farms are proposed. The model finds the optimal schedule for maintaining the turbines and the optimal routes for the crew transfer vessels to service the turbines along with the number of technicians required for each vessel. The model takes into account multiple vessels, multiple periods (days),...

متن کامل

A New Control Method for Smoothing PMSG-based Offshore Wind Farm Output Power

Nowadays, propagation of wind turbines make challenges to supply safe power to the grid. Because of wind speed changes, supervisors are concerned to wind turbines, be able to produce appropriate electric power during the wind speed changes. As a matter of fact, investors are mostly like to invest on offshore wind farms, because of their more stable and continuous wind speed rather than onshore ...

متن کامل

Avian collision risk at an offshore wind farm.

We have been the first to investigate whether long-lived geese and ducks can detect and avoid a large offshore wind farm by tracking their diurnal migration patterns with radar. We found that the percentage of flocks entering the wind farm area decreased significantly (by a factor 4.5) from pre-construction to initial operation. At night, migrating flocks were more prone to enter the wind farm ...

متن کامل

PHM Based Predictive Maintenance Option Model for Offshore Wind Farm O&M Optimization

A simulation-based real options analysis (ROA) approach is used to determine the optimum predictive maintenance opportunity for multiple wind turbines with remaining useful life (RUL) predictions in offshore wind farms managed under outcome-based contracts, i.e., power purchase agreements (PPAs). When an RUL is predicted for a subsystem in a single turbine using PHM, a predictive maintenance op...

متن کامل

Development of a Maintenance Option Model to Optimize Offshore Wind Farm Sustainment

This paper presents a method that uses a simulation-based real options analysis to determine the value of waiting after obtaining a remaining useful life (RUL) indication from prognostics and health management (PHM) structures within a wind turbine. This methodology potentially allows the threshold for maintenance to be optimized in real-time based on the state of health of the turbine, the ant...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Renewable and Sustainable Energy Reviews

سال: 2015

ISSN: 1364-0321

DOI: 10.1016/j.rser.2014.10.087