A Pilot Survey on Causes of Delay in Malaysian Construction Project
نویسندگان
چکیده
منابع مشابه
a study on construction of iranian life tables: the case study of modified brass logit system
چکیده ندارد.
15 صفحه اولAnalyzing delay causes in Egyptian construction projects
Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through i...
متن کاملA Study Identifying Causes of Construction Waste Production and Applying Safety Management on Construction Site
Background and purpose: In a recent century, the amount of construction waste has increased significantly. Although the building industry has a considerable role in the development of a society, it is regarded as an environmentally destructive. Source reduction is the highest goal in the waste management hierarchy and is in priority. It also has economic benefits by reducing costs associated wi...
متن کاملA Study On Causes Of Accident And Prevention In Malaysian Construction
The construction industry is a dynamic and innovative industry that delivers building and infrastructure for all aspects of commercial and domestic activity. This dynamic and innovative industry faced with safety challenges on a project-by-project and day-by-day basis. Hence, this research objective is to identify the causes of accident happened in construction sites and measures order to impro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: MATEC Web of Conferences
سال: 2014
ISSN: 2261-236X
DOI: 10.1051/matecconf/20141501010