A note on a model for quay crane scheduling with non-crossing constraints

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint

In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...

متن کامل

An Approximation Algorithm for Quay Crane Scheduling with Non- interference Constraints in Port Container Terminals

Nowadays competition between port container terminals, especially between geographically close ones, is rapidly increasing. How to improve the competitiveness of port container terminals is, therefore, an immediate challenge, with which port operators are confronted. In terms of port competitiveness, the makespan of a container vessel, which is the latest completion time among all handling task...

متن کامل

Quay crane scheduling with non-interference constraints in port container terminals

The quay crane scheduling problem studied in this paper is to determine a handling sequence of holds for quay cranes assigned to a container vessel considering interference between quay cranes. This paper provides a mixed integer programming model for the considered quay crane scheduling problem that is NP-complete in nature. A genetic algorithm is proposed to obtain near optimal solutions. Com...

متن کامل

A Quay Crane Scheduling Model in Container Terminals

This paper discusses the problem of scheduling quay cranes, the most important equipment in port terminals. A simulation model is developed for evaluating time of quay cranes. Then a dynamic scheduling model using objective programming for quay cranes is developed based on genetic algorithm approach. Finally, numerical experiments on a specific container terminal are made for propose approach. ...

متن کامل

A modified generalized extremal optimization algorithm for the quay crane scheduling problem with interference constraints

The quay crane scheduling problem (QCSP) determines the handling sequence of tasks at ship bays by a set of cranes assigned to a container vessel such that the vessel’s service time is minimized. A number of heuristics or metaheuristics have been proposed to obtain the near-optimal solutions to overcome the NP-hardness of the problem. In this article, the idea of generalized extremal optimizati...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Engineering Optimization

سال: 2014

ISSN: 0305-215X,1029-0273

DOI: 10.1080/0305215x.2014.958731