A Nonlinear Multiobjective Bilevel Model for Minimum Cost Network Flow Problem in a Large-Scale Construction Project

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Nonlinear Multiobjective Bilevel Model for Minimum Cost Network Flow Problem in a Large-Scale Construction Project

The aim of this study is to deal with a minimum cost network flow problem MCNFP in a largescale construction project using a nonlinear multiobjective bilevel model with birandom variables. The main target of the upper level is to minimize both direct and transportation time costs. The target of the lower level is to minimize transportation costs. After an analysis of the birandom variables, an ...

متن کامل

A Fuzzy Random Minimum Cost Network Flow Programming Problem

In this paper, a fuzzy random minimum cost flow problem is presented. In this problem, cost parameters and decision variables are fuzzy random variables and fuzzy numbers respectively. The object of the problem is to find optimal flows of a capacitated network. Then, two algorithms are developed to solve the problem based on Er-expected value of fuzzy random variables and chance-constrained pro...

متن کامل

A Novel Experimental Analysis of the Minimum Cost Flow Problem

In the GA approach the parameters that influence its performance include population size, crossover rate and mutation rate. Genetic algorithms are suitable for traversing large search spaces since they can do this relatively fast and because the mutation operator diverts the method away from local optima, which will tend to become more common as the search space increases in size. GA’s are base...

متن کامل

The Minimum Universal Cost Flow in an Infeasible Flow Network

In this paper the concept of the Minimum Universal Cost Flow (MUCF) for an infeasible flow network is introduced. A new mathematical model in which the objective function includes the total costs of changing arc capacities and sending flow is built and analyzed. A polynomial time algorithm is presented to find the MUCF.

متن کامل

A Neural Network Model Based on Support Vector Machine for Conceptual Cost Estimation in Construction Projects

Estimation of the conceptual costs in construction projects can be regarded as an important issue in feasibility studies. This estimation has a major impact on the success of construction projects. Indeed, this estimation supports the required information that can be employed in cost management and budgeting of these projects. The purpose of this paper is to introduce an intelligent model to im...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2012

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2012/463976